Posts Tagged ‘Environmental’
TH 23 North Gap
TH 23 is an important corridor that is the primary east-west route that connects Willmar to I-94. The TH 23 North Gap project is currently under construction, and is anticipated to be completed in the fall of 2023. The 9-mile, $41.75 million project is taking place from County Road 33 in Paynesville to Highway 22…
Read MoreI-94 St. Michael to Albertville and Monticello to Clearwater Design-Build Projects
These two design-build projects started in 2019 and will be completed in the fall of 2022. These projects were unique as both shared the same the contractor, QA (MnDOT and MnDOT verification), and QC (contractor verification) personnel. The St. Michael to Albertville segment provided construction on 6 miles of roadway and cost approximately $65 million,…
Read MoreI-35W North MnPass
The I-35W North MnPass Project was completed in late 2021 and cost approximately $208 million; the three-year Project consisted of the addition of MnPass (now E-ZPass) lanes in both northbound and southbound directions. Construction activities along the 12.5-mile alignment also included ramp and bridge replacement & repairs between County Road C in Roseville and Sunset…
Read MoreHighway 14
This project will expand 12.5 miles of Hwy 14 from two lanes to four lanes between Dodge Center and Owatonna to complete a continuous four-lane road between Mankato and Rochester. The project is intended to improve the capacity, safety, travel times and access between Rochester and Owatonna, as well as the I-35 corridor. The expansion…
Read MoreSt. Croix Crossing
The St. Croix River crossing in Stillwater, Minnesota is a highway bridge connecting downtown Stillwater to the Town of St. Joseph in St. Croix County, Wisconsin. The crossing consists of a 1,050 foot-long, 10-span, 2-lane bridge and a 750-foot earthen causeway extending from the Wisconsin shoreline. It is known as “The Lift Bridge,” because one…
Read More